Energy, EU – Baltic States, Good for Business, Lithuania

International Internet Magazine. Baltic States news & analytics Monday, 06.05.2024, 03:43

WindTamer turbine installed in Lithuanian Kunkiai

Petras Vaida, BC, Vilnius, 03.08.2011.Print version
The renewable energy systems' operator Arista Power announced the first installation of 8.0GT WindTamer turbine – the largest of the current WindTamer turbines – in Kunkiai, Lithuania, a residential community approximately 25 km north of Klaipeda, the company reports.

It was the first WindTamer turbine, installed in Europe.

 

The turbine was installed by UAB WindTamer Europe, which in April, 2011 obtained the exclusive distribution rights for WindTamer turbines and other Arista Power products in Lithuania, Latvia, Denmark, Sweden and The Netherlands, writes LETA/ELTA.

 

Klaipeda is Lithuania's seaport city and is also the location of the headquarters of UAB WindTamer.

 

Arista Power, Inc., a developer, manufacturer, and supplier of custom-designed power management systems, renewable energy storage systems, WindTamer wind turbines, and a supplier of solar energy systems.

 

The turbine was installed by UAB WindTamer Europe (UAB WindTamer or the “Distributor”), which in April, 2011 obtained the exclusive distribution rights for WindTamer turbines and other Arista Power products in Lithuania, Latvia, Denmark, Sweden and The Netherlands.






Search site