Up Next
0
Repairs to bridge will take some time
The Sarah Long Bridge in Portsmouth will remain closed two to four weeks to repair the damage caused when a 473-foot tanker hit the bridge Monday afternoon.
Share
Repairs to bridge will take some time
The Sarah Long Bridge in Portsmouth will remain closed two to four weeks to repair the damage caused when a 473-foot tanker hit the bridge Monday afternoon.
Date: 4/2/13
Views: 52
Video by:  WMUR Manchester
 
Follow us:
Loading... 1 of 167
Today's Most Watched Videos
Related Videos
Loading... 1 of 56