Up Next
0
Tracking time and reporting task progress: Clos...
This video provides a high-level walkthrough of the process and roles involved with updating a timesheet after a time reporting period has been closed in Project Server 2010. This is referred to as "closed-period updating." (Created by Sonia Atchison, Microsoft Technical Writer)
Share
Tracking time and reporting task progress: Closed-period updating (Project Server 2010)
This video provides a high-level walkthrough of the process and roles involved with updating a timesheet after a time reporting period has been closed in Project Server 2010. This is referred to as "closed-period updating." (Created by Sonia Atchison, Microsoft Technical Writer)
Date: 2/14/11
Views: 1117
 
Follow us:
Loading... 1 of 167
Today's Most Watched Videos
Related Videos
Loading... 1 of 56